Edit Selected Event Rather Than Entire Series

  • 2
  • Idea
  • Updated 9 months ago
At some point, the facility scheduler system got changed so that when I want to edit a scheduled event, the default is now to edit the series rather than the current event. This has resulted in my deleting or changing the series rather than the single event -- and it's happened many times. How can I set my scheduler to default to edit only the event?
Photo of Beth Angerhofer

Beth Angerhofer

  • 17 Posts
  • 0 Reply Likes
  • frustrated

Posted 9 months ago

  • 2

Be the first to post a reply!